< Solutions

CapsolGo® 

Carbon capture demonstration unit 

 

An environmentally friendly, portable, carbon capture demonstration unit with an all-inclusive package

Transport, installation, deinstallation, operation, deployment, and testing by an independent party – it's all included!

Solutions

CapsolEoP®

CapsolGT®

CapsolGo® is a powerful tool to demonstrate safe carbon capture to stakeholders to verify the effectiveness of the Capsol’s EoP (end-of-pipe) solution on the emitters' plant and accelerate the process and investment decision for full-scale carbon capture.

The CapsolEoP® carbon capture solution can capture CO2 from a wide range of industries with flue gas CO2 concentration levels from 3-30%.

The CO2 purity of the dried gas is more than 99%, meeting storage and utilization requirements.

In total, our units and previous tests have more than 13,000+ hours of operation verifying the effectiveness of theCapsolEoP® solution.

Key highlights

All-inclusive mobile, small-scale carbon capture demonstration units for cement, biomass, energy-from-waste (EfW), power generation and large industrial facilities.

Test your plant’s specific flue gas and operation to define an optimal solvent blend for the full-scale carbon capture plant.

Capture capacity of up to 700 tons CO2/year.

An affordable solution to get maximum insights into safe carbon capture technology.

The capture unit can run on electricity only and there is no need to build an additional boiler for steam production.

Capsol's integrated heat recovery results in significantly lower energy consumption than comparable technologies, and has superior HSE which eases permitting.

 

During a demonstration campaign you will:

Be able to verify the effectiveness of Capsol's solution before considering a full-scale carbon capture plant

Test the safe and environmentally friendly Potassium Carbonate solvent - a white salt commonly used in the food industry 

Validate carbon capture for your plant's specific flue gas and operation to define an optimal solvent blend for the full-scale plant

Showcase how CO2 technology works to both internal and external stakeholders, and the public

Get familiar with carbon capture and prepare for full-scale operations of a capture plant

Get an independent third party test report providing valuable data and input which will help accelerate your decision processes towards a full-scale CO2 plant and strengthen the quality of your soft funding applications

During a demonstration campaign you will:

Be able to verify the effectiveness of Capsol's solution before considering a full-scale carbon capture plant

Test the safe and environmentally friendly Potassium Carbonate solvent - a white salt commonly used in the food industry 

Validate carbon capture for your plant's specific flue gas and operation to define an optimal solvent blend for the full-scale plant

Showcase how CO2 technology works to both internal and external stakeholders, and the public

Get familiar with carbon capture and prepare for full-scale operations of a capture plant

Get an independent third party test report providing valuable data and input which will help accelerate your decision processes towards a full-scale CO2 plant and strengthen the quality of your soft funding applications

Selected CapsolGo® carbon capture and liquefaction campaigns

Selected CapsolGo® carbon capture and liquefaction campaigns

Plant type:

City, country:

Year: 

Full-scale plant size:

Demonstration time:

Liquefaction unit:

EfW combined heat and power (CHP)

Helsingborg, Sweden

Start 09/22 – end 04/23

~210,000 tons CO2/year

5+ months

No

Plant type: EfW combined heat and power (CHP)

City, country: Helsingborg, Sweden

Year: Start 09/22 – end 04/23

Full-scale plant size: ~210,000 tons CO2/year

Demonstration time: 5+ months

Liquefaction unit: No

Plant type:

Country:

Year: 

Full-scale plant size:

Demonstration time:

Liquefaction unit:

EfW combined heat and power (CHP)

Germany

Start 05/23 – end 12/23

~400,000 tons CO2/year

5+ months

Yes

Plant type: EfW combined heat and power (CHP)

Country: Germany

Year: Start 05/23 – end 12/23

Full-scale plant size: ~400,000 tons CO2/year

Demonstration time: 5+ months

Liquefaction unit: Yes

Plant type:

City, country:

Year: 

Full-scale plant size:

Demonstration time:

Liquefaction unit:

EfW combined heat and power (CHP)

Hannover, Germany

Start 10/23 – ​end 06/24

~280,000 tons CO2/year

5+ months

No

Plant type: EfW combined heat and power (CHP)

City, country: Hannover, Germany

Year: Start 10/23 – ​end 06/24

Full-scale plant size: ~280,000 tons CO2/year

Demonstration time: 5+ months

Liquefaction unit: No

Plant type:

Country:

Year: 

Full-scale plant size:

Demonstration time:

Liquefaction unit:

Biomass

Germany

Start 12/23 – end 07/24

~150,000 tons CO2/year

6+ months

Yes

Plant type: Biomass

Country: Germany

Year: Start 12/23 – end 07/24

Full-scale plant size: ~150,000 tons CO2/year

Demonstration time: 6+ months

Liquefaction unit: Yes

Plant type:

Country:

Year: 

Full-scale plant size:

Demonstration time:

Liquefaction unit:

Biomass fired CHP

Växjö, Sweden

Start 06/24 – end 09/24

~350,000 tons CO2/year

3+ months

Yes

Plant type: Biomass fired CHP

Country: Växjö, Sweden

Year: Start 06/24 – end 09/24

Full-scale plant size: ~350,000 tons CO2/year

Demonstration time: 3+ months

Liquefaction unit: Yes 

Plant type:

Country:

Year: 

Full-scale plant size:

Demonstration time:

Liquefaction unit:

EfW combined heat and power (CHP)

Sweden

Start 10/24 – end 03/25

~500,000 tons CO2/year

5+ months

Yes

Plant type: EfW combined heat and power (CHP)

Country: Sweden

Year: Start 10/24 – end 03/25

Full-scale plant size: ~500,000 tons CO2/year

Demonstration time: 5+ months

Liquefaction unit: Yes

Please reach out. I'd be happy to help

Please reach out. I'd be happy to help

Trudi Christensen

Commercial Development Manager

[email protected]

 

GET IN TOUCH